Texas Leadership Charter Academy
Renovation of 3250 State Street, Abilene, Texas (formerly State Street YMCA) for a new campus for Texas Leadership Charter Academy. Approximately 38,900 sf of demo and 44,900 sf of finish-out.
The Owner will receive sealed Bids until 1:00 PM local time, Wednesday, February 3, 2021, at 5687 Melrose Ave, San Angelo, TX 76901.
A Pre-bid meeting will be held at the site, 3250 State Street, on Wednesday, January 27, 2021, at 10:30 am. Masks are required. Other times may be arranged with Greg Flores, 325-653-3200 ext 7006 or Howard Patterson, 1-916-212-0242.
Subscribe to this project for notification of drawing releases. Instructions at right.
Drawings:
Specifications:
Architectural Specifications (5mb)
Original construction drawings:
1959 Construction Drawings (18 mb)
1962 Addition Drawings (12 mb)
1998 Addition Drawings (17 mb)
Justice Construction (325) 695-0427f: (325) 695-0420 bids@sjusticeconstruction.com
COLLIER CONSTRUCTION COMPANY (806) 741-1982F: (806) 741-1985cache@colliertx.com
TEINERT CONSTRUCTION, INC. (806) 744-2801F: (806) 744-2401estimating@teinert.com
W B Kibler Construction (214) 358-4601
Item 40 is USG Corporation: “Radar ClimaPlus High CAC, High NRC” . Item number 22441, per specification section 09 51 00, Acoustical Ceiling Panels.
Install 4-square j-box at wall and at projector locations interconnected with 1-1/2" conduit. Provide HDMI Active Plenum Rated Cable (4K) equal to #41370 (verify length required) and Rapid Run Cable #60004 (verify length required).
Provide HDMI, VGA and 3.5 mm Audio Pass Through Single Gang Wall Plate - Brushed Aluminum equal to #41034 at both wall and projector locations. https://www.cablestogo.com/
Each speaker home runs to Room 134 Server.
Speaker can, if required, is work of Owner's communications contractor.
At 165, seating is portable aluminum bleachers. LVT goes from the existing gym floor, north the wall behind the seating, and wall to wall in the east-west direction.
photo set 1
photo set 2
Specification ADDENDA:
Section 00 11 13, Advertisement for Bid, changed to reflect new bid date of February 3, 2021.
Architectural Drawings ADDENDA:
1.10 changed to eliminate phasing
2.10 changed to eliminate phasing
3.10 changed to eliminate phasing and add backfilling the pool
3.11 changed to eliminate phasing
4.10 changed to eliminate phasing
6.10 changed to eliminate phasing
6.50 changed footing sizes and detailed connection to exist. concrete
8.10 changed to eliminate phasing
9.10 changed to eliminate phasing