The Lytle Lake Water Control and Improvement District (LLWCID) intends to select a professional engineering firm to provide design services for repair of the Lytle Lake Service Spillway, correction of dam deficiencies, and development of an O&M plan. The 300′ concrete spillway constructed in 1914 shows deterioration typical of a structure of this age. Other deficiencies are noted in the TCEQ Dam Inspection Report of 1-17-2022.