YMCA of Abilene will be accepting general construction bids for addition and alterations of the Redbud Park Facility. Work includes 11,641 sf addition, demolition and renovation of 12,092 existing sf in 3 phases, and replacement of parking lot.
Phase 2 Construction Documents:
Phase 2 Architectural Drawings (76 mb)
Phase 2 MEP Drawings (14.5 mb)
Project Conditions Specifications (? mb)
Architectural Specifications (1.3 mb)
Original construction drawings for information only:
1985 Construction Drawings (736 mb)
1998 Addition Drawings (514 mb)
Justice Construction 3,721,000 / -72,250
Teinert Construction 3,860,000 / -142,000
The Crowe Group 4,127,000 / - 100,000
Collier Construction 4,250,000 / -150,000
Our sincerest thanks to all bidders and our greatest appreciation for the time and talent you committed to the YMCA.
JUSTICE CONSTRUCTION, INC.
P: (325) 695-0427
steve@sjusticeconstruction.com
david@sjusticeconstruction.com
bids@sjusticeconstruction.com
COLLIER CONSTRUCTION COMPANY
P: (806) 741-1982
F: (806) 741-1985
cache@colliertx.com
FLETCO SERVICES, LP
P: (325) 280-8435
bryce@fletcoservices.com
jordan@fletcoservices.com
TEINERT CONSTRUCTION, INC.
P: (806) 744-2801
F: (806) 744-2401
estimating@teinert.com
THE CROWE GROUP, INC.
P: (325) 676-0132
F: (325) 676-4615
bids@crowegroup.biz
JUSTICE CONSTRUCTION, INC.
P: (325) 695-0427
Sheet 9.10, Room Finish Schedule:
1. Room 123, Cooking Lab: ceramic wall tile goes on the North wall in lieu of the East wall as indicated.
2. Room 404, Steam Room: schedule indicates walls of both painted gyp. bd. and 5/8" Dens Shield. Omit painted gyp. bd. All walls are 5/8" Dens Shield per sheet 4.41
3. Room 506, Steam Room: Flooring is ceramic tile "14" in lieu of vinyl tile indicated.
4. Room 507, Sauna: Flooring is Ceramic tile "14".
CLARIFICATION:
In Corridor 606 walls, everything on the East side is ceramic tile floor to ceiling. Everything on the west side is new paint on existing painted CMU.
Hardware finish = Oil rubbed bronze (Detail K9, Sheet 8.10)
HPDL Door laminate is Wilsonart "Brazilwood" (Detail K9, Sheet 8.10)
ASI toilet accessories are an acceptable substitute for Bobrick provided they the same appearance, capacity, and dimension.
ASI toilet partitions are not an acceptable substitute for Scranton Eclipse partition system. Key features of Scranton Eclipse are color-through panels, privacy door edges, hidden hardware, small aluminum post is the only contact with the floor, good color selection range. Nearest ASI system is Alpaco with custom color color-through phenolic panels. If that is cost competitive, we can revisit this but Scranton Eclipse is currently the only acceptable toilet partition system.